Global Switch London East
Client
Global Switch
Project location
London, United Kingdom
Project date
2025
Installation
Datalec Precision Installations / DPI
Project Partner
Hilson Moran, Burns & McDonnell, AFK Studios, JPR
Mission-critical lighting for AI-ready data centre infrastructure
In the heart of London’s Docklands, Zumtobel supports the ongoing transformation of Global Switch London East with a scalable lighting solution for high-performance, technically demanding data centre environments. The solution combines precise visibility, reliable emergency lighting and intelligent lighting control – designed for flexibility, efficiency and the growing demands of AI and high-performance computing infrastructure.
Built for mission-critical performance
Global Switch London East required a lighting solution capable of supporting highly demanding data centre operations across multiple floors. From precise visibility at rack level to intelligent emergency lighting, robust technical luminaires and scalable system architecture, Zumtobel delivered a flexible lighting platform designed for reliability, efficiency and future adaptability.
"The lighting solution from Zumtobel supports safe and efficient operations while giving us the adaptability required to meet evolving customer demands. It forms part of the wider infrastructure platform that enables us to support increasingly complex AI and high-performance computing deployments"
Derek Allen, Group Operations Director, Global Switch